Houses are being connected to the power grid (houses 14/1, 14/2, 14/3, 14/4, 14/5, 14/6, 14/12, 14/13, 14/14, 14/15, 14/16 , 14/17, 14/18, 14/19, 14/20, 14/21). Refinement of the input group continues. The stakes under the lighting poles of the children’s playground are installed. The supply of cables to the embedded ones has been made. The entrance gate group (gate, gate) is mounted. A fence is being installed. Planting a lawn at the entrance group.