Installation of roofs of houses 14/38, 14/39. Installation of the electrical connection of the town is underway. Gravel paving of the road is being produced. The pit for the foundation of the house 14/31 is under construction. The roof of the house 14/37 is being insulated. Windows were installed in houses 14/37, 14/38, 14/39, 14/40, 14/41.